HS/FA/23/00498
|
The refurbishment of 3 existing arches to provide improved accommodation for Project Art Works' Studios and staff, improved accessibility to all arches and improvements to external landscaping and approaches. Demolition of existing external walls to arches 2 and 3 and replacement with new external walls to meet current building regulations. New canopies to the eastern elevation. Re-configuration of internal areas of all arches to improve accessibility. External works to include re-grading of eastern approach to improve accessibility to arches 2 and 3, the formation of a new compliant external access ramp in rear yard (west side).
|
Linton Arches, Braybrooke Terrace, Hastings, TN34 1TD
Name | Constraint Type |
---|---|
Network Rail Land Ownership | Land within the Borough in the ownership of Network Rail |
Low Pressure Pipeline SGN | Scotia Gas Networks Low Pressure Pipeline |
Network Rail Land Ownership 10M Buffer | 10m Buffer around Land within the Borough in the ownership of Network Rail |
Local Plan Planning Strategy Policy FA2 | Local Plan Planning Strategy 2011-2028 Policy FA2 - Strategic Policy for Central Area Adopted 19/2/2014 |
Flooding Groundwater | Potentially within an Area of Groundwater flooding Environment Agency |
GCN District Licensing Scheme Pond Buffer 250m | Not Available |
GCN District Licensing Scheme IRZ - RED | District Licensing Scheme - Great Crested Newts Red Impact Risk Zone https://naturespaceuk.com/ |
Flooding Surface Water 1 in 30 | Potentially within an Area of Surface Water Flooding (1 in 30 yearly chance) Environment Agency |
Flooding Surface Water 1 in 1000 | Potentially within an Area of Surface Water Flooding (1 in 1000 yearly chance) Environment Agency |
Flooding Surface Water 1 in 100 | Potentially within an Area of Surface Water Flooding (1 in 100 yearly chance) Environment Agency |